Projects
CLIENT: GEOSERVICE
Project description: Engineering studies of mining components of the UM Cobriza - OCP and modification of the environmental impact study, OT-MI 327.1 2023, MILESTONE 03-40% according to OS-AMB-0221-2023
Period: Jan 2024 to July 2024
Description of the service: Preparation of the LOM 12,000 tpd mining plan.
CLIENT LUBAMBE COPPER MINES
Project description: Diamond drilling and water control (ring cover drilling and grouting)
Period: July 2018 to ongoing
Description of the service: Diamond drilling from underground on the perimeter of the haulage up to the depth of 36mtrs to seal water.
CLIENT METRO MINING LIMITED
Project description: Diamond drilling core logging interpreation and pit design agt lufwanyama emerald area.
Period: September 2018 to ongoing
Description of the service: Surface diamond drilling, core logging and interpretation of the samples.
CLIENT CRESCO RESOURCES ZAMBIA LTD
Project description: Diamond drilling works at mumbwa area
Period: September 2018 to ongoing
Description of the service: Surface diamond drilling at mumbwa area, central province Zambia.
CLIENT TONGGUANG MININIG CONSTRUCTION
Project description: Drilling and grouting at the service shaft at chambishi mines mukulumpe area
Period: September 2017 on goiong
Description of the service: Diamond drilling works and grouting up to the depth of 500 mtrs for water control purposes.
CLIENT KICO MINES NEW GENERATION
Project description: Drilling and grouting at the main ramp for water sealing
Period: September 2017 to december 2017
Description of the service: Diamond drilling works and grouting up to the depth of 10 mtrs for water control purposes.
CLIENT LUFUBU HYDROPOWER COMPANY LTD
Project description: In situ geotechnical investigation
Period: August 2017 to december 2017
Description of the service: Diamond drilling, packer test, trenches recovery of undisturb samples, permeabilty test.
CLIENT SUYONG NATURAL RESOURCES
Project description: Diamond drilling works at mwense area
Period: July 2017 to december 2017
Description of the service: Diamond drilling works in pq, hq, and nq in mwense area. luapula province.
CLIENT RED PATH MINING LIMITED
Project description: Drilling and grouting at the ramp at mindolo sv
Period: Jan 2016 to june 2017
Description of the service: Diamond drilling works, and water control at the ramp and decline services.
CLIENT MOPANI COPPER MINES PLC
Project description: Diamond drilling with directional drilling to intersect the required targets
Period: July 2014 to september 2015
Description of the service: Diamond drilling (directional drilling) from underground with directional drilling to intersect the ore body up to the depth of 850 mtrs.
Contacts
18427 Vincennes St. Unit. No. 22
Northridge CA 91325 USA
Socials
Subscribe to our newsletter
(51) 980531430
QUEJAS Y RECLAMOS ar_diaz_pe@yahoo.com